Certi

Electrical Installation Condition Reports (EICR)

An EICR is a periodic inspection and test of a fixed electrical installation, graded against BS 7671. Private landlords in England must hold a satisfactory report at least every five years and supply a copy to tenants. Certi issues the report within 24 hours of the inspection, with every observation explained in plain English.

What's covered

Scope of work

Full periodic inspection

Consumer unit, distribution boards, circuits, bonding, earthing and a sampled inspection of accessories.

Dead and live testing

Continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation.

Coded observations

C1 danger present, C2 potentially dangerous, C3 improvement recommended, FI further investigation — each with a photo.

Remedial quotation

A separate itemised price to clear C1 and C2 items, never bundled into the inspection fee.

How it works

Our process

  1. 01

    Book a slot

    Morning or afternoon window, with tenant liaison if you are a landlord or agent.

  2. 02

    Inspect and test

    Two to four hours for a typical property, with power off in stages.

  3. 03

    Receive the report

    Signed PDF within 24 hours, plus a summary of what each code means for you.

  4. 04

    Clear the remedials

    Optional fixed-price works, followed by a satisfactory re-issue.

Pricing guidance

What it typically costs

Guide prices for properties within our core coverage area. Additional boards, restricted access or unsafe pre-existing conditions can change the quote — we confirm in writing first.

1–2 bedroom flat
Single consumer unit, up to 8 circuits.
From £120
3–4 bedroom house
Up to 12 circuits, one distribution board.
From £180
HMO and commercial
Priced per distribution board and circuit count after a short survey.
Quoted
Coverage

Service areas

Local teams, local knowledge and honest response times.

Frequently asked questions

How often do I need an EICR?+

Private rented homes in England need one at least every five years or at change of tenancy if sooner. Owner-occupied homes are advised every ten years, and HMOs every five.

What happens if the report is unsatisfactory?+

Landlords must complete the remedial work within 28 days, or sooner if the report specifies, and supply written confirmation to tenants and the local authority on request.

Do you need to turn the power off?+

Yes, in stages. Expect the supply to be off for periods across the inspection. We plan around tenants and work-from-home schedules where we can.

Can I use my own contractor for the remedials?+

Absolutely. The report is yours, and the observations are written so any competent electrician can act on them.

Related training

Related reading