BS 7671 Amendment 4:2026 — what changed and what it means on site

Amendment 4 — the Orange Book — was published on 15 April 2026. The Brown Book stays valid until 15 October 2026, so you have a short window to get current before the changeover.

Updated 2026-09-22

The transition date that matters

BS 7671:2018+A4:2026 was published on 15 April 2026 and can be worked to immediately. Amendment 3:2024, the Brown Book, remains a valid standard until 15 October 2026, so during that window installers may design and certify to either edition.

Pick one edition per job and state it on the certificate. Mixing clauses from both books across a single installation is where disputes start.

Battery storage gets its own chapter

The headline change is a new chapter covering stationary secondary batteries used to store and supply an installation. It sets out requirements for system design, power conversion equipment, bidirectional and hybrid inverters, and whether your protective devices are actually suitable for two-way energy flow.

It also puts real weight on the physical side: where the battery is located, ventilation, and fire risk mitigation. If you have been treating a home battery as an accessory bolted onto a solar install, that approach no longer matches the standard.

  • · Confirm protective devices are rated for bidirectional current
  • · Assess battery location, ventilation and fire separation as part of the design
  • · Treat vehicle-to-home and vehicle-to-grid setups as a storage system, not an EV accessory

Power over Ethernet and ICT functional earthing

A new section covers Power over Ethernet installations, which have quietly become a mainstream electrical load in offices, schools and care settings. There is also a new section on functional earthing and functional equipotential bonding for information and communication technology equipment.

If you install cabling for cameras, access control, lighting nodes or wireless access points, these sections are now part of your compliance scope rather than someone else's.

Medical locations rewritten

Section 710 on medical locations received a major revision, including a schedule of test results for recording the resistance of supplementary protective equipotential bonding conductors. Anyone working in dental practices, clinics or healthcare premises needs to read this section in full rather than rely on memory.

EICRs and the evidence you can attach

The revised model condition report moves Further Investigation to an advisory status, which means an installation can be recorded as satisfactory while still carrying FI observations. Expect this to be argued over on jobs for the next year, so be explicit in your notes about why you coded what you coded.

More usefully, reports can now carry photographic evidence and thermal imaging results. That is a straightforward win for proving condition to landlords, agents and insurers.

The small change that touches everything

Indented lists have moved from Roman numerals to letters to align with other British Standards. It sounds trivial, but every reference point shifts, so your training notes, method statements, checklists and office templates all need reviewing against the Orange Book.

What to do this month

Buy or subscribe to the Orange Book, book an Amendment 4 update, and log it as CPD with dates and hours. Scheme assessors will ask how you have kept current, and a dated record of an update course is the cleanest answer you can give them.

Newsletter

Certi Trade Dispatch

A short monthly email for the trade: regulation changes, new best-practice guidance, fresh calculators and course dates. No spam, unsubscribe any time.

Frequently asked questions

When does Amendment 3 stop being valid?+

Amendment 3:2024 — the Brown Book — remains valid until 15 October 2026. After that, work to BS 7671:2018+A4:2026.

Do I need to re-sit my 18th Edition for Amendment 4?+

You are not automatically required to, but scheme assessors expect you to demonstrate current knowledge, and an update course or re-sit is the cleanest evidence.

What is the biggest technical change?+

The new chapter on stationary secondary batteries, covering design, bidirectional inverters, protective device suitability, location, ventilation and fire risk.

Does Amendment 4 affect EICRs?+

Yes. The model form moves Further Investigation to advisory status and allows photographic and thermal imaging evidence to be included.

Is Amendment 4 a full rewrite?+

No. It is a substantial update rather than a new edition, but the renumbering of indented lists means most existing references and training material need checking.