UK earthing systems explained: TN-S, TN-C-S, TT and what Ze should read

Identifying the earthing arrangement is the first thing you do at the intake and the thing most likely to be recorded wrongly. Get it wrong and every Zs limit, bonding decision and EV charger design that follows is wrong too.

Updated 2026-09-24

The three arrangements you will actually meet

BS 7671 names the arrangement with two letters. The first describes the supply earthing, the second describes how exposed-conductive-parts of the installation are earthed. In UK domestic and light commercial work you will meet TN-S, TN-C-S and TT, with IT reserved for specialist applications such as some medical and industrial installations.

  • · TN-S — separate neutral and protective conductors throughout, earth usually taken from the sheath of the supply cable
  • · TN-C-S (PME) — combined neutral and earth in the supply, separated at the cut-out into a neutral and an earthing terminal
  • · TT — no supply earth at all, the installation relies on its own earth electrode

How to tell them apart at the intake

On a TN-S supply the earthing conductor is clamped to the lead or steel sheath of the incoming cable, usually with a separate earth terminal beside the cut-out. On TN-C-S the earthing conductor comes out of the supplier's cut-out or an adjacent terminal block, because the earth is being derived from the combined neutral.

On a TT supply there is no supplier earth. You will find an earth rod, often outside near the intake, and the installation will depend on RCD protection for fault protection. If you cannot find a supply earth and cannot find an electrode, you have a problem, not a TT system.

Typical maximum Ze values

Distribution network operators quote maximum external earth fault loop impedance figures for each arrangement. These are design limits, not pass marks — your measured value should normally be well below them.

  • · TN-S — maximum 0.8 Ω, commonly measured at 0.2 to 0.4 Ω
  • · TN-C-S (PME) — maximum 0.35 Ω, commonly measured at 0.05 to 0.25 Ω
  • · TT — no DNO figure; the electrode resistance is typically expected below 200 Ω, with RCD protection mandatory

Why PME changes your bonding

On a TN-C-S supply the neutral carries fault and load current back to the transformer, and a break in that combined conductor can push the installation earth up to a dangerous potential. Main protective bonding is what holds all the extraneous-conductive-parts at the same potential when that happens, which is why the bonding conductor size on PME is generally 10 mm² rather than the 6 mm² you might get away with on TN-S.

It is also why a broken or missing main bond is normally coded C2 on an EICR rather than an improvement recommendation.

EV charging and the PEN fault problem

An EV charge point puts a person in contact with a large earthed metal object outdoors, which is exactly the scenario a PEN fault on a PME supply makes dangerous. Section 722 of BS 7671 requires either an earth electrode dedicated to the charge point, or a device that disconnects on detecting a PEN fault by monitoring the supply voltage.

Most modern chargers integrate the detection device. If you inspect one that does neither, that is a coded observation, not a note.

TT installations in practice

TT is common on rural supplies, farms, overhead-fed properties and older caravan sites. Because the earth path runs through soil, the loop impedance is far too high for an overcurrent device to clear an earth fault in time. RCD protection is therefore not optional — it is the fault protection.

Expect a time-delayed or S-type RCD at the origin with 30 mA devices downstream, so a final circuit fault does not take out the whole installation.

Recording it correctly

The earthing arrangement goes on every certificate and report, alongside measured Ze and the prospective fault current. Once you have recorded it, use the Certi maximum Zs tool to check your circuit readings against the right limits for the protective devices fitted.

Newsletter

Certi Trade Dispatch

A short monthly email for the trade: regulation changes, new best-practice guidance, fresh calculators and course dates. No spam, unsubscribe any time.

Frequently asked questions

What is the difference between TN-S and TN-C-S?+

TN-S has separate neutral and protective conductors all the way from the transformer, with the earth taken from the supply cable sheath. TN-C-S combines them in the supply and separates them at the cut-out, which is why it is called protective multiple earthing.

What is the maximum Ze for a TN-C-S supply?+

Distribution network operators quote a maximum of 0.35 Ω for TN-C-S (PME). TN-S is 0.8 Ω. Measured values are usually well below both.

Why does a PME supply need 10 mm bonding?+

Because a break in the combined neutral and earth conductor can raise the installation earth to a dangerous potential, and the bonding has to be capable of carrying the resulting current while holding everything at the same potential.

Can you install an EV charger on a PME supply?+

Yes, provided the installation either has a dedicated earth electrode for the charge point or uses a device that disconnects the supply on detecting a PEN fault, as required by Section 722.

Does a TT installation have to have an RCD?+

Yes. The earth path through soil has far too high an impedance for an overcurrent device to provide fault protection, so RCDs are relied on for disconnection.

What earth electrode resistance is acceptable?+

There is no single figure in BS 7671, but a value below 200 Ω is generally regarded as stable in UK conditions, and it must be low enough for the RCD in use to disconnect within the required time.